Blue Moon Mark 1
Blue Origin · United States · Programme · 2027 · Commercial and multipolar In development
In development, waiting on its rocket: pathfinder Endurance is fully assembled and thermal-vacuum tested, with a cryogenic propellant-loading test next, but the May 28, 2026 New Glenn pad explosion pushed its debut to early 2027 (NASA and Blue Origin, Sep 15, 2026); VIPER rides a second MK1, targeted for 2027 (NASA, Oct 20, 2026).

TL;DR· 9 min read
Blue Moon Mark 1 is Blue Origin's robotic cargo lander, built to put up to 3 metric tons on the lunar surface in a single New Glenn launch. The first flight article, Endurance, completed environmental testing at NASA Johnson, announced May 4, 2026, but a New Glenn destroyed in a May 28, 2026 static-fire explosion took out the only operational pad and pushed the debut to early 2027 (NASA and Blue Origin, September 2026). NASA has assigned the revived VIPER rover to a second MK1 under a task order worth up to $190 million, targeted for 2027 (NASA, October 2026).
Blue Moon Mark 1 is Blue Origin's robotic cargo lander, built to put up to 3 metric tons on the lunar surface in a single New Glenn launch. As of November 2026 it is a finished spacecraft without a ride: the first flight article, named Endurance, completed environmental testing at NASA Johnson, announced May 4, 2026, but its launcher and only operational pad were knocked out when a New Glenn exploded during a May 28, 2026 static-fire test, and Blue Origin now points to no earlier than the first quarter of 2027 for the pathfinder flight. NASA has bet on the vehicle anyway: it assigned the revived VIPER ice-hunting rover to a second MK1 in September 2025 under a task order worth up to $190 million, with delivery targeted for 2027 (NASA, October 20, 2026).
Facts as of 2 November 2026, from the sources listed below.
- 3 tonnescargo MK1 is rated to deliver to the lunar surface
- $190 millionNASA task order to land VIPER on the second MK1
- 100 mprecision-landing accuracy the pathfinder must prove
- 0MK1 flights so far; NASA's launch schedule lists the debut for 2027 (as of Nov 2026)
Targets are the operator's current plan (as of 2 November 2026) and can change.

Blue Moon Mark 1 is the uncrewed half of Blue Origin's two-lander Blue Moon family: an 8.05-meter-tall, hydrogen-fueled lander massing 21,350 kg fueled and rated to deliver 3,000 kg to the lunar surface, launched complete on a single New Glenn with no orbital refueling. Its single BE-7 engine, a dual-expander liquid-oxygen/liquid-hydrogen design producing up to 44 kN and throttling down to 8.9 kN for touchdown, is the same engine that will power the much larger crewed Blue Moon MK2 that Blue Origin is building for NASA's Artemis program. That is the program's real logic: MK1 flies first, largely on Blue Origin's own money, to retire the cryogenic propulsion, avionics and precision-landing risks before astronauts ride an MK2.
The first lander was named Endurance on January 20, 2026, after Ernest Shackleton's ship, as it shipped from Florida to Houston; it completed testing in the historic Thermal Vacuum Chamber A at NASA's Johnson Space Center, announced May 4, 2026. The pathfinder mission is meant to demonstrate the BE-7 in flight, cryogenic propulsion, autonomous guidance, navigation and control, and landing within 100 meters of its target on the Shackleton Connecting Ridge near the lunar south pole. NASA is a paying passenger rather than the customer of record: under CLPS task order CT-3 (about $6.1 million, awarded August 2024) the lander carries the SCALPSS 1.x stereo cameras to image the engine plume carving into regolith, plus a Laser Retroreflector Array. At a May 26, 2026 event NASA folded the flight into its new Moon Base push as Moon Base I, and awarded Blue Origin two further MK1 cargo delivery task orders ($188 million, plus a $280.4 million option period) that would put lunar terrain vehicles on later MK1 landers ahead of a crewed Artemis landing targeted 2028 (as of May 2026).
The second MK1 carries the program's headline passenger. NASA canceled its VIPER ice-mapping rover in July 2024 on cost and schedule grounds after spending about $450 million and essentially finishing assembly, then kept the completed rover intact while it looked for a cheaper ride. On September 19, 2025 (release 25-064) the agency assigned VIPER to a second Blue Moon MK1 under a CLPS task order worth up to $190 million, targeting delivery to the lunar south pole in late 2027; NASA's October 20, 2026 update still gives 2027, with the fully built rover in final testing at Johnson Space Center. The structure is deliberately conditional: a base phase pays Blue Origin to design how the lander accommodates and offloads the rover, and NASA exercises the actual delivery option only after reviewing both that work and the outcome of the first MK1 flight. VIPER would then spend roughly 100 days prospecting for water ice in and around permanently shadowed terrain.
Everything now waits on the rocket. New Glenn reached orbit on its January 16, 2025 debut, then landed its booster at sea for the first time while launching NASA's ESCAPADE Mars probes on November 13, 2025, and reflew that booster on April 19, 2026, a flight that still counted as a mishap after an upper-stage malfunction left the BlueBird 7 satellite in an unusable orbit. Just over five weeks later, on May 28, 2026, the next New Glenn was destroyed in a fireball during a pre-launch static fire at Launch Complex 36, heavily damaging Blue Origin's only operational New Glenn pad; no one was injured. Endurance itself was untouched (the destroyed rocket was assigned to an Amazon Leo satellite launch, and the lander was fresh out of testing in Houston), but the pathfinder's fall 2026 launch slot died with the rocket. At NASA's June 30, 2026 Moon Base event, Blue Origin CEO Dave Limp pointed the pathfinder to early 2027 (NET Q1 2027 on launch manifests) and outlined a hybrid vertical-integration scheme, replacing the destroyed transporter-erector, meant to get New Glenn flying again before the end of 2026, a goal NASA says it can afford to see slip into 2027. By mid-October 2026 New Glenn had still not flown again, the damaged pad was being rebuilt, and Jeff Bezos said the company was still pushing to fly before the end of the year. On October 28, 2026 SpaceNews reported that Blue Origin expects the rebuilt pad to be ready by the first half of December to support that return to flight.
azmth files Blue Moon MK1 as a program rather than a single mission because that is what is now on the manifest: the Endurance pathfinder, the VIPER delivery, and two Moon Base cargo deliveries, all on the same lander design, with the crewed MK2 waiting behind them. The stakes are bigger than any one flight. MK1 is built to carry liquid hydrogen propulsion all the way to the lunar surface, a cryogenic capability NASA's Artemis architecture leans on, and VIPER's ice map is one of the datasets every south-pole base plan, American or Chinese, ultimately wants.
01Mission facts
Organisations
Blue Origin (US, commercial)
Status (as of Nov 2, 2026)
Pathfinder lander Endurance fully assembled and environmental-tested, with cryogenic propellant loading the next test before integration for launch (NASA, 4 Aug 2026), but grounded with its rocket after the New Glenn pad explosion; first flight in the first part of 2027 per NASA's Moon Base program manager and early 2027 per Blue Origin's senior director of civil space (both 15 Sep 2026). NASA's launch schedule lists 2027 with no month (updated 21 Oct 2026)↗
Lander
8.05 m tall, 3.08 m diameter, 21,350 kg fueled; up to 3,000 kg of cargo to the lunar surface on a single New Glenn launch↗
Engine
One BE-7: dual-expander liquid oxygen/liquid hydrogen, up to 44 kN, throttling down to 8.9 kN for landing↗
NASA payloads (CLPS delivery CT-3)
SCALPSS 1.x stereo cameras (plume-surface imaging during descent) and a Laser Retroreflector Array, bound for the lunar south pole↗
CLPS task order value
About $6.1 million (August 2024) to fly SCALPSS; small because Blue Origin funds the pathfinder mission itself as a demonstration↗
Name
First MK1 lander named Endurance on 20 January 2026, for Ernest Shackleton's ship, as it shipped to Houston for testing↗
Landing target
Shackleton Connecting Ridge, lunar south pole; NASA designated the flight Moon Base I at its 26 May 2026 Moon Base announcement↗
Environmental testing
Completed in Thermal Vacuum Chamber A at NASA's Johnson Space Center, announced 4 May 2026↗
VIPER assignment
NASA release 25-064 (19 September 2025): task order worth up to $190 million to deliver the VIPER rover on a second MK1, targeted late 2027; delivery option exercised only after review of the base task and the first MK1 flight↗
VIPER backstory
Canceled by NASA on 17 July 2024 on cost and schedule grounds after about $450 million spent, with the nearly finished rover kept intact; revived via the Blue Origin award↗
New Glenn record (as of Nov 2026)
Three flights: orbit on the 16 January 2025 debut; first booster landing with ESCAPADE on 13 November 2025; booster reflight 19 April 2026 that left its payload in a wrong orbit↗
Pad explosion
28 May 2026: the next New Glenn, slated to carry Amazon Leo satellites, was destroyed during a static-fire test at Launch Complex 36, with extensive pad damage and no injuries↗
Return to flight
Blue Origin aims to fly New Glenn again before the end of 2026 (per CEO Dave Limp, 30 June 2026), shifting to hybrid vertical integration after losing its transporter-erector; NASA says its lunar plans can tolerate a slip into 2027. In October 2026 Jeff Bezos said the company was still pushing to fly again before the end of the year, while its LC-36A pad was being rebuilt (Spaceflight Now, 16 Oct 2026). On 28 Oct 2026 SpaceNews reported that Blue Origin expects the rebuilt pad to be ready by the first half of December to support a return to flight in 2026↗
02Mission timeline
9 May 2019
Jeff Bezos unveils the Blue Moon lander program in Washington, DC
17 Jul 2024
NASA announces cancellation of the VIPER rover after about $450 million spent; the finished rover is preserved
Aug 2024
NASA awards Blue Origin CLPS task order CT-3, about $6.1 million, to fly SCALPSS on the MK1 pathfinder
16 Jan 2025
New Glenn reaches orbit on its first flight; the booster is lost during its landing attempt
19 Sep 2025
NASA assigns VIPER to a second Blue Moon MK1: task order worth up to $190 million, delivery targeted late 2027
13 Nov 2025
New Glenn's second flight launches NASA's ESCAPADE Mars probes and lands its booster at sea for the first time
20 Jan 2026
Blue Origin names the first MK1 lander Endurance and debuts its mission patch as the lander ships to Houston
19 Apr 2026
New Glenn's third flight reuses the recovered booster and lands it again, but an upper-stage malfunction strands the BlueBird 7 satellite in an unusable orbit
4 May 2026
NASA announces Endurance completed environmental testing in Johnson Space Center's Thermal Vacuum Chamber A
26 May 2026
NASA's Moon Base announcement brands the pathfinder flight Moon Base I and adds MK1 cargo delivery task orders ($188 million plus a $280.4 million option period)
28 May 2026
The next New Glenn is destroyed in a static-fire explosion at Launch Complex 36, heavily damaging the pad; no injuries
30 Jun 2026
At NASA's Moon Base event, Blue Origin CEO Dave Limp outlines New Glenn return-to-flight plans and points the MK1 pathfinder to early 2027
Targeted early 2027
Pathfinder launch, listed for 2027 on NASA's launch schedule (as of Nov 2026) and early 2027 by Blue Origin, pending New Glenn return to flight and pad recovery
Targeted 2027
VIPER delivery, 2027 per NASA's October 20, 2026 update (late 2027 at the September 2025 award), contingent on NASA exercising the option after the first MK1 flight; NASA says the fully built rover is in final testing at Johnson Space Center
A filled dot marks something that physically happened. A hollow one marks an announcement, a naming or a target.
03In pictures
Tap a photo to enlarge.
04Sources
- NASA release 25-064: Blue Origin selected to deliver VIPER (Sep 19, 2025)
- NASA: Moon Base rovers progress update, VIPER fully built and in final testing at Johnson, South Pole mission in 2027 (Oct 20, 2026)
- NASA CLPS delivery CT-3 science page (SCALPSS 1.x and LRA)
- NASA: Blue Moon MK1 completes Chamber A testing (May 4, 2026)
- NASA: Moon Base rovers, landers and missions update (May 26, 2026)
- SpacePolicyOnline: initial Moon Base rover and lander contracts (May 2026)
- SpaceNews: New Glenn rocket explodes on Cape Canaveral pad (May 2026)
- Spaceflight Now: New Glenn explodes during prelaunch testing (May 29, 2026)
- Spaceflight Now: Blue Origin outlines New Glenn return-to-flight logistics (Jun 30, 2026)
- SpaceNews: NASA payload to fly on first Blue Origin lunar lander mission (Aug 2024)
- SpaceNews: NASA cancels VIPER lunar rover (Jul 2024)
- collectSPACE: Blue Moon MK1 Endurance name and patch debut (Jan 20, 2026)
- Wikipedia: Blue Moon Pathfinder Mission 1 (NET Q1 2027, CT-3 details)
- Wikipedia: Blue Moon (spacecraft) (MK1 specifications)
- Blue Origin: Blue Moon Mark 1 program page
- Aerospace America: NASA's Moon Base program manager and Blue Origin on Mark 1 in the first part of 2027 (Sep 15, 2026)
- NASA: Moon Base cargo landers and tech demonstrations update, Endurance fully assembled with cryogenic propellant loading next (Aug 4, 2026)
- NASA launch schedule: Moon Base, Blue Origin Blue Moon Mark 1, 2027 (updated Oct 21, 2026)
- Spaceflight Now: Blue Origin to add new Florida launch pads, still pushing to fly New Glenn again before the end of 2026 (Oct 16, 2026)
- SpaceNews: Blue Origin still pushing for return to flight of New Glenn this year, rebuilt pad expected ready by the first half of December (Oct 28, 2026)
Facts on this page were verified on 2 November 2026.
azmth is independent and is not affiliated with or endorsed by NASA, CNSA, Roscosmos, ISRO, JAXA, or any other space agency or company named on this page.